    Steering Committee Packs for Client Programmes

    How engagement leads build a steering committee pack for a client programme, with decision requests, honest status and a record the committee can act on.

    A steering committee on a client programme usually meets once a month. It has a chair, a sponsor, four or five senior members, and often one or two people who have joined since the last meeting and have not read the earlier papers. The agenda promises an hour. The first twenty minutes go on recapping where the programme stands, the next fifteen on a supplier issue that nobody expected, and the decisions that the programme actually needs are pushed to the end, where they are taken quickly or deferred to a call nobody remembers arranging.

    The fault is rarely the meeting itself. It lies in the paper that should have prepared it. Too many committee packs are a collection of slides that report activity: workstream updates, a Gantt chart, a list of meetings held. Members read them as background, and the committee has no clear view of what it is being asked to decide, what it is being asked to accept, or what will happen if it does neither. The pack has informed people without equipping them to act.

    This article describes how engagement leads can build a steering committee pack for a client programme so that it does the job a committee needs done. It covers what the pack is for, who it is written for, how to structure it, how to report status honestly, how to frame decisions so they can be made, how to build the pack from meeting records and programme documents, and how to handle the sensitive material that a client committee sometimes needs and sometimes must not see. It is written for engagement leads, senior consultants and programme managers in management consulting, legal and accounting advisory, agencies and IT services who run or support governance on client work. Where a steering committee for a client programme is mentioned, the same approach applies to a programme board or a sponsor group under another name.

    What a steering committee pack is for

    A steering committee pack has one purpose: to let the committee make the decisions that only it can make, at the meeting, on the basis of a clear and honest account of the programme. Everything in the pack should serve that purpose. If a section does not help a member decide, accept or escalate something, it probably belongs somewhere else, such as the programme's full status reporting, the working group's minutes or an appendix that nobody needs to read in the room.

    This distinguishes the pack from three related documents that firms often confuse with it. A status report is a regular account of progress, usually written for the sponsor or the client's programme office, and it can be issued between committees. Client meeting minutes are the agreed record of what happened and what was decided, written after the meeting and confirmed with the client. The pack is written before the meeting and used to prepare the decisions within it. The article on client meeting minutes and sign-off covers the record that follows; the article on writing client status reports from meeting records covers the regular updates. A good committee pack draws on both, but it has a different job.

    There is also a difference between a committee pack and a consultant's internal briefing. The client briefing pack is an internal document, prepared for the firm's own people, and it may contain cautions that must never reach the client. The committee pack is a client-facing governance document. It is read by the client's leadership, may be minuted, and may be referred to months later. Everything in it must be fit for that use, and anything that is internal belongs in the briefing pack instead.

    Finally, the pack is a record. When a decision made at a committee is later questioned, the pack shows what the committee was told at the time, what options were put to it and what it chose. A pack that presented a green status when the team already knew the programme was slipping does not just weaken the meeting. It weakens the programme's audit trail and the firm's credibility.

    Who the pack is for

    Before drafting anything, the engagement lead should be clear about the readers. In most committees there are at least four kinds of reader, and they read the pack for different reasons.

    The chair reads the pack to plan the meeting. They want to know which items need time, which decisions are contentious, and whether anything has changed since the last meeting that will require a different agenda. The chair usually reads the pack more carefully than anyone else, and often wants a short conversation with the engagement lead before the meeting. The pack should make that conversation easy.

    The sponsor reads the pack to judge the programme. They are accountable for its outcome, and they need to know whether it is on course, what it needs from them and what they are being asked to accept. For the sponsor, the decisions section and the escalations section matter most.

    The members read the pack to decide how to contribute. Some are representatives of the functions that will be affected by the programme. They want to know what their function is being asked to do, what risks sit with them, and whether a decision affects their budget or their people. A member who is not given this information in the pack will raise it in the room, and that is one of the main causes of a long meeting.

    The late joiner reads the pack to catch up. Committees change membership, and a new member may arrive after several meetings. Their needs are different: they need enough context to understand the decisions in front of them without reading every earlier paper. The engagement paragraph and a short history section serve this reader.

    A useful test is to imagine each reader with twenty minutes before the meeting and ask whether the pack allows them to prepare properly. If it does not, the pack is too long, too vague or too concerned with activity.

    The structure of the pack

    A steering committee pack for a client programme works best with a stable structure. The headings should stay the same from one meeting to the next, so that members learn where to look and so that a change in a heading signals a change in the programme. The following sections are a sound starting point. Firms and programmes will adjust the order and the detail, but most packs need something close to them.

    The first section is the cover summary, which runs to half a page at most. It states the meeting date, the purpose of the meeting, and the decisions and escalations requested, in that order. A member who reads only this section should know whether they need to come prepared to decide something, and what. The summary also gives the overall status of the programme in one line, with the reason for that rating and a note of any change since the last committee.

    The second section is the decisions required. Each decision has its own short entry, and it is written so that the committee can take it without further discussion. This section is covered in more detail below, but the rule to start with is simple: every decision entry states what is being asked, the options considered, the recommendation, and what happens if the committee defers.

    The third section is the programme status, usually organised by workstream or by the programme's main deliverables. Each workstream has a rating, a short account of progress against the plan, the main risks and the next milestone. The rating must be defined in advance and applied consistently, and the reasons for it must be stated. Status is discussed in more depth below.

    The fourth section is the escalations and risks that need the committee's attention. These are not every risk on the register. They are the items that the programme cannot resolve within its own authority, that are likely to affect the outcome, or that the committee has asked to see. Each escalation states the issue, the impact, what the programme has already tried, and what it needs from the committee.

    The fifth section is the change requests. These cover scope, budget, timetable and resourcing changes that need formal approval. A change request in a committee pack should show the cost and time impact, the reason for the change, the alternatives considered and the effect on the other workstreams. Where the change has been approved within the programme's delegated authority, it should appear here for information, not as a decision.

    The sixth section is the commitments and actions. This is a short list of actions due before the next committee, grouped by owner, with a status for each. It is useful for two reasons. It shows the members what they have been asked to do, and it shows the committee whether the programme is keeping its own promises. A long list of overdue actions is itself an escalation, and the pack should say so.

    The seventh section is the history of decisions. This is a brief record of the decisions taken at the previous one or two committees, with the outcome of each. It connects one committee to the next, and it prevents the same decision from being taken twice because someone forgot the first time.

    The eighth section is the appendix. This holds the detail that some readers want: the full risk register, the detailed plan, the financial breakdown, the supplier correspondence. The appendix is referenced in the body but kept out of the way, so that the main pack stays short.

    Keeping the appendix separate is one of the most useful disciplines in the whole pack. Committee members who want detail can find it. Those who do not are not forced to wade through it.

    Reporting status honestly

    Status is the section that most often damages a committee pack, usually through optimism. Every programme has an incentive to report green, because green is comfortable to present and avoids difficult questions in the room. A pack that is green in every workstream until the moment a deliverable is missed teaches the committee that the ratings mean nothing. Once that happens, the committee stops reading them, and the programme loses its best early warning.

    The first safeguard is to define the rating scale before the programme reports against it. A common scale has four levels: on track, at risk, off track and not yet rated. The definitions should be written in the programme's governance documents, and each should describe the condition that triggers it in observable terms. For example, "at risk" might mean that a milestone is likely to slip by more than an agreed tolerance without a recovery plan, and "off track" might mean that the slip has happened or the recovery plan has failed. The exact thresholds belong to the programme and its sponsor. What matters is that they are written down and used by everyone.

    The second safeguard is to attach evidence to every rating. A rating without a reason is a feeling. A rating with a reason can be tested by the committee. Each workstream entry should therefore state what the rating is based on: the milestone that has moved, the dependency that is outstanding, the resource that is missing, the decision that has not been taken. A line such as "amber: the data access decision, due last month, has not been taken, and the design phase depends on it" gives the committee something to act on. A line such as "amber: some concerns" does not.

    The third safeguard is to show the trend. A status that has been amber for three committees in a row tells a different story from one that has just changed. Each workstream entry should show the rating at the previous committee, so that a change is visible at a glance and a persistent problem is impossible to miss. Where a rating has not moved for several months, the committee should ask why, because a steady rating can hide a slow decline.

    The fourth safeguard is to resist the temptation to downgrade a rating only when the news is bad enough to be unavoidable. Engagement leads sometimes wait for a sponsor's reaction before moving a rating, and by then the committee has lost weeks. The rule should be that a rating changes when the evidence changes, and that the programme tells the sponsor before the pack is circulated, not in the meeting. Surprises in the room damage trust far more than an honest amber in the pack.

    Finally, be careful with language that softens bad news. Phrases such as "some slippage", "minor challenges" and "under review" can make a serious issue look routine. Where a milestone has been missed, say so, state the new date if there is one, and state whether that date is confirmed. Plain language builds more confidence than careful phrasing.

    Framing decisions so they can be made

    A decision section is only useful if the committee can take a decision from it. Many packs fail this test. They describe an issue at length and then ask the committee to "note" or "discuss" it, which leaves the committee with no clear action and the programme with no clear instruction. A decision should be framed so that the committee can say yes, no, or yes with conditions, and so that the consequences of each answer are visible.

    Each decision entry should begin with the question in one sentence. For example: "Does the committee approve a six-week extension of the design phase, funded from contingency?" The question should be specific enough that the answer is clear. A question that asks the committee to "consider the timetable" invites discussion without resolution.

    Next, state the options. Most decisions have at least two options: the recommended one and the alternative. Sometimes there are three. For each option, state what it involves, what it costs in money and time, what risk it carries and what it would mean for the other workstreams. Where an option is not realistic, say why, so that members do not spend time on it.

    Then state the recommendation. The programme should not leave the committee to work out what the team thinks. A recommendation shows the committee that the programme has done the analysis and has a view, and it gives the sponsor something to agree or challenge. Where the recommendation depends on an assumption, state the assumption and say what would change the answer.

    Next, state the consequence of deferral. This is often the most important part of the entry, and it is frequently missing. A committee that defers a decision needs to know what the deferral costs. If the design cannot start until the decision is taken, say so, and say when the design will be affected. If the decision can wait until the next committee without harm, say that too. A deferral that has no stated consequence is usually a deferral that goes on for several meetings.

    Finally, check the authority. Some decisions belong to the committee, some to the sponsor, some to the client's procurement or finance function, and some to the firm's partner. The pack should state who has the authority to take the decision, and it should not ask the committee to decide something that falls outside its remit. Asking for an out-of-scope decision wastes the meeting and undermines the chair's confidence in the papers.

    A worked example of a decision entry might read as follows, in general terms. The question is whether to proceed with a supplier change request. The options are to approve the change, to approve it with a cap on the additional cost, or to reject it and keep the original scope. The recommendation is the second option, with the reasoning set out. The consequence of deferral is that the supplier's current resource allocation expires at the end of the month, and a later start would add a fixed delay. The authority section notes that the cap falls within the committee's delegated limit. That entry gives the committee everything it needs to decide in five minutes.

    Building the pack from meeting records and programme documents

    A steering committee pack is only as good as the record behind it. Most of the content comes from three sources: the working group summaries and minutes, the programme's action and decision logs, and the risk, issue and dependency register. Documents such as the plan, the statement of work and the change request log supply the formal baseline against which progress is measured.

    The engagement lead should collect these sources in the week before the committee. The working group summaries show what was discussed and decided since the last meeting. The action log shows what was promised and whether it was delivered. The risk, issue and dependency register shows what is open, what has changed and what has been escalated. The change log shows what has been approved and what is pending. The plan shows where the programme should be. Comparing these sources is the basis of the status section.

    Where a meeting summary is produced by an automated tool, treat it as a draft. Summaries can omit points, credit remarks to the wrong person and present a tentative comment as a decision. Before a summary supports a rating or a decision entry, check the claim against the source. For a decision, that means confirming in the record that the decision was taken, by whom, and in what form. For a milestone, it means checking the date against the plan and the latest confirmed position from the delivery team.

    It helps to build a short reconciliation table, in working notes rather than in the pack, that lists each rating and its supporting evidence. If a rating cannot be traced to a source, it should be questioned before the pack is circulated. This reconciliation takes an hour or two for a programme of moderate size, and it is one of the most effective checks available.

    Work out the status from the plan, not from the mood of the team. Delivery leads are often close to their work and may be more or less optimistic than the evidence supports. A conversation with the delivery lead is valuable, but the rating should rest on the plan, the action log and the dependencies. Where the delivery lead's view differs from the evidence, record both, and let the engagement lead decide which the pack should reflect, with the reasons.

    The timeline and pre-wiring

    Committee packs are most effective when they follow a predictable cycle. A common pattern runs over about a week. The engagement lead drafts the pack several days before the committee, reviews it with the programme manager, and then holds a short conversation with the chair. The pack is circulated to members with enough time to read it, usually a few working days before the meeting. Any late changes are flagged in a short covering note rather than made silently.

    The conversation with the chair is one of the most important steps in the cycle. It is sometimes called pre-wiring, and it has a clear purpose: to make sure the chair knows what is in the pack, which decisions are contentious, and where the programme expects difficulty. A chair who is surprised in the meeting is less able to lead it well. A chair who has been briefed can plan the agenda, ask the right questions of the right people and close items cleanly.

    Pre-wiring also gives the sponsor an opportunity to challenge the pack before it reaches the other members. A sponsor who disagrees with a recommendation should be able to say so in private, and the engagement lead should be prepared to explain the reasoning. Where the sponsor and the programme cannot agree, the pack should show both positions, with the reasons, rather than presenting a consensus that does not exist.

    Pre-wiring should be proportionate. Not every item needs a conversation. A routine status update needs little. A decision with budget implications, a contested risk or a change to the timetable needs a clear discussion with the chair and, usually, the sponsor. A short note in the programme's governance file, recording who was briefed and what was agreed, makes this process visible and defensible.

    If the pack is late, say so. A committee that receives a pack two hours before the meeting cannot prepare, and a committee that receives an incomplete pack will spend its time on the gaps. Where a pack cannot be circulated in time, the chair should be told immediately, and the meeting should decide whether to proceed with a reduced agenda or move the item to the next committee. A late pack that is hidden behind an on-time cover note is worse than an honest delay.

    A worked example: a phase gate for an integration programme

    Consider a programme to integrate the operations of two organisations after a merger. The client is the combined business, and the consultancy is supporting the design and the programme management. The steering committee includes the chief operating officer as sponsor, the finance director, the human resources director, the technology director, the head of the largest business unit and the programme's external legal adviser for one item. The committee meets monthly, and the programme is approaching its design phase gate, which is a decision point before the build phase begins.

    The engagement lead prepares the pack in the week before the committee. The cover summary states that the meeting is for the design phase gate decision, that the programme is at risk overall, and that one decision and two escalations are requested. The overall rating has moved from on track to at risk since the last committee, and the reason is stated: a data access decision that was due three weeks earlier has not been taken, and the design phase depends on it.

    The decisions section asks whether the committee approves the design phase gate with a conditional release of the build budget. The options are to approve the gate in full, to approve it with a condition that the data access decision is taken within two weeks, or to defer the gate until the data decision is complete. The recommendation is the second option, and the reasoning is that the design is substantially complete, that the remaining work on data access is well defined, and that a full deferral would hold the build team idle at a cost the programme has estimated. The consequence of deferral is stated: the build team's allocation expires at the end of the following month, and reallocating the team would add a fixed delay. The authority line notes that the conditional release falls within the committee's delegated limit.

    The status section shows the technology workstream at risk, because the data access decision is outstanding, and the operations workstream on track. The finance workstream is shown as amber because of a change request on reporting, which is in the change requests section. The rating for each workstream shows the previous committee's rating, so the committee can see that the technology workstream has been amber for one meeting and is now more serious.

    The escalations section raises the data access issue. It states what the programme has already tried: two working sessions, a written request to the client's data governance team, and a proposal for an interim arrangement. It states that the issue is outside the programme's authority, because the data governance team reports to a different executive, and it asks the sponsor to resolve the matter with that executive. The second escalation concerns the legal adviser's review of the contract variation, which is taking longer than planned.

    The commitments section lists the actions due before the next committee. Two are overdue, both owned by the client's technology team. The pack says so, and it notes that the overdue actions are the reason for the at-risk rating in the technology workstream. The chair reads the pack, asks the engagement lead for a short conversation the day before, and agrees that the data access item will be the first substantive item in the meeting. The sponsor agrees to take the escalation to the data governance executive after the meeting.

    In the meeting, the committee approves the conditional release with the two-week condition, notes the change request and asks the sponsor to report back on the data decision at the next meeting. The decision is recorded in the decision history section of the next pack, with the outcome. Nothing in the meeting is a surprise to anyone who read the pack, and the discussion is about the decisions rather than the background.

    Sensitive content and confidentiality

    A committee pack is a client-facing governance document, but it is not always appropriate for every member to see everything. Some content is confidential to the client's leadership, some is commercially sensitive, and some is personal. The engagement lead needs to make these distinctions before the pack is circulated, not after.

    A simple distinction helps. The committee pack should contain what the committee needs to govern the programme. Anything that is about a named individual's performance, that comes from a private conversation or that concerns a potential conflict of interest belongs in a separate, restricted note to the chair or the sponsor, not in the general pack. The programme should decide in advance who receives which documents, and the circulation list should be checked against each pack.

    Commercially sensitive material needs similar care. Supplier pricing, negotiating positions and the consultancy's own margins are not normally committee material, unless the committee has asked for them. Where a change request involves a supplier's price, the pack should show the impact on the programme and the approved budget, not the internal breakdown of the supplier's offer, unless the client has specifically asked for that breakdown and the terms allow it.

    Personal data also needs attention. Committee packs sometimes include the names of individuals responsible for actions, the staffing consequences of a decision or the views of named people on a contentious issue. Under the UK GDPR, personal data should be used for a stated purpose and kept to what that purpose requires. In practice, a pack should name the owner of an action where that matters for accountability, but it should not record opinions about individuals or details of their personal circumstances. Where a decision affects people's roles, the pack should describe the effect, and the detailed consultation should happen through the client's own processes.

    Finally, keep the consultancy's internal material out of the committee pack entirely. The firm's internal assessments of the client, its commercial strategy, its concerns about a colleague and its notes on the chair's preferences belong in the briefing pack or in internal governance, not in the document the client receives. Before each pack is circulated, the engagement lead should check it against this rule, and a second reader should be asked to look for anything that should not be there.

    Running the meeting from the pack

    A good pack does not run the meeting, but it makes it easier to run well. The chair should be able to follow the agenda using the cover summary and the decisions section, and to move quickly through the routine items so that the committee's time goes on the items that need judgement. The engagement lead's role in the room is to answer questions from the pack, to make clear where the evidence is thinner than the rating suggests and to record decisions accurately.

    Recording decisions is critical. The decision should be recorded in the terms the committee used, including any conditions and any delegated authority. Where the committee changed the recommendation, the change should be recorded exactly. Where a decision was deferred, the record should state the date and the owner of the next step. Where a member disagreed, the disagreement should be recorded if they ask for it, and if the committee's procedures require it.

    The decision log should be updated within a day of the meeting, and the follow-up actions should be circulated with it. The engagement lead should check the draft minutes against the decision log before they are sent to the client for confirmation. A decision that is recorded differently in the minutes from how it was taken in the room is a common source of later disputes, and a short check after the meeting prevents most of them. The article on client meeting minutes and sign-off describes how the confirmed record should be kept.

    The decision history section of the next pack should show each decision from the previous meeting and its outcome. This closes the loop. A decision that was made but not implemented should appear as an escalation. A decision that was implemented should be marked as closed, with the date and the evidence.

    Using the pack between committees

    The pack is written for a meeting, but its value lasts longer than the meeting. Between committees, the decision history, the escalations and the commitments keep the programme honest about what it has promised. An engagement lead who opens each week by checking the open escalations and the overdue commitments will usually spot a problem before it reaches the next pack, and that is a far better position than discovering it in the room.

    It is useful to keep the working version of the pack alive during the month. When a decision is taken outside the committee under delegated authority, record it in the decision history at once, so that the next pack does not have to reconstruct it. When an escalation is resolved informally, update the escalation and note who resolved it and when. When a commitment slips, change its status the day it slips, rather than waiting for the next cycle, and tell the owner that the status is now overdue.

    Between committees, the engagement lead should also watch for signals that a rating is about to change. A key member who has stopped attending working sessions, a dependency whose owner has changed, or a supplier that has missed two consecutive deliverables may each be an early sign. These are not yet evidence for a new rating, but they are reasons to speak to the programme manager and, where appropriate, the sponsor before the next pack is drafted. A pack that reports a change the sponsor has heard about for the first time in the pack is a pack that arrived too late.

    Finally, the pack should be reviewed after each committee, not only before the next one. Ask what the committee asked for that the pack did not provide, which items took too long, and which decisions were deferred without a clear consequence. Adjust the structure, the rating definitions or the level of detail accordingly. A committee pack that improves steadily over six or eight cycles is one of the clearest signs that the governance of a client programme is being run well.

    Common mistakes

    The most common mistake is writing the pack as a report of activity. The workstream sections describe what the team did, in detail, and the decisions and escalations are buried at the end. The committee reads the activity and feels informed, but it has not been asked to do anything. The fix is structural: put the decisions and escalations near the front, and move the activity detail into the status section and the appendix.

    The second mistake is status that is green by default. Programmes that report green until the last moment train their committees to ignore the ratings. The fix is a defined scale, evidence for every rating and a visible trend, as described above.

    The third mistake is decisions that cannot be made. An entry that asks the committee to "note the position" or "consider the options" is not a decision request. Rewrite it as a specific question with options, a recommendation and a stated consequence of deferral.

    The fourth mistake is pre-wiring too late, or not at all. A chair who is surprised by the pack will spend the meeting trying to understand it. The fix is a short conversation with the chair before circulation, and an agreed time for the sponsor's challenge.

    The fifth mistake is letting the pack go stale between meetings. A pack built from last month's records and not updated for a key change will mislead. The fix is to check the cover summary and the escalations against the latest evidence in the week before circulation, not only at the start of the cycle.

    The sixth mistake is mixing internal and client-facing material. A line about a supplier's negotiating position or a consultant's private view of a member can appear in a pack by accident, especially when a pack is built from a working file. The fix is a final review against the confidentiality rule before circulation.

    A checklist for the committee pack

    The following checklist covers the points that most often cause problems. It can be used for every committee, and it is short enough to complete in the final day before circulation.

    Confirm the meeting date, the purpose and the attendee list against the latest invitation, and check the circulation list against the confidentiality rule. Write the cover summary with the purpose, the decisions and escalations requested and the overall rating with its reason and its change since the last meeting.

    Write each decision entry with the question, the options, the recommendation, the consequence of deferral and the authority. Check that every decision is within the committee's remit. Write the status for each workstream with its rating against the defined scale, the evidence for the rating and the rating at the previous meeting. Check that every rating can be traced to a source.

    Write the escalations with the issue, the impact, what has been tried and what is needed. Write the change requests with cost, time, reason, alternatives and effect on other workstreams. List the commitments and actions due before the next committee, with owners and status, and say so if any are overdue. Summarise the decisions from the last meeting and their outcomes.

    Check that the appendix holds the detail and that the body stays short. Confirm the pre-wiring with the chair has happened, and record the sponsor's view. Review the pack once more against the confidentiality rule, and check that no internal material is included. Record the date of circulation, the name of the person who prepared the pack and the name of the person who reviewed it.

    Closing thoughts

    A steering committee pack is a small document with a large job. It prepares the people who must make the programme's hardest decisions, it gives them an honest account of where the programme stands, and it creates a record of what they were told and what they chose. A pack built on activity reporting, green ratings and vague requests for discussion fails at all three. A pack built on clear decisions, evidence-backed status and a record that connects one meeting to the next does not.

    The discipline is not complicated. Define the rating scale and apply it honestly. Frame each decision so that the committee can take it. Build the pack from the records and the documents, and check them against the sources. Speak to the chair before the pack reaches the members. Keep the internal material in its own place. Over a few committees, the difference shows: the meetings get shorter, the decisions get taken on time, and the members trust the papers enough to read them.

    Frequently asked questions

    How long should a steering committee pack be?

    Aim for a main body that a member can read in about twenty minutes, with the decisions and escalations in the first two pages. Detailed plans, registers and financial breakdowns belong in an appendix that is referenced but kept separate. If the body is longer than that, the pack is probably describing activity rather than asking for decisions.

    Who should approve the content of a committee pack before it is circulated?

    The engagement lead prepares the pack, and a second reader should check it, usually the programme manager or a senior colleague who was not involved in drafting. The chair should be briefed before circulation, and the sponsor should have the chance to challenge the recommendations. Any disagreement that remains should be shown in the pack, with both positions and their reasons.

    What should happen if a programme rating is green but the evidence points to a problem?

    The rating should be changed to match the evidence, and the programme should tell the sponsor before the pack is circulated rather than in the meeting. A green rating that the evidence does not support weakens every later rating, because the committee will no longer trust the scale. The reason for the change should be stated in the workstream entry, with the trend visible from the previous committee.

    Can automated meeting summaries be used as the source for a committee pack?

    They can be used as a starting point, but they should be treated as drafts. Before a summary supports a rating or a decision entry, the claim should be checked against the source, such as the recording, the working group's own notes or the decision log. Summaries can omit points, misattribute remarks and present a tentative comment as a decision, so an unchecked summary should never be the only basis for a committee decision.