    Proposal Writing from Discovery Calls: Using Client Language Accurately

    How to write proposals from discovery notes that reflect the client's own problem, terms and priorities, with checks that keep claims and scope accurate.

    A proposal is often the first document a client reads that is written about them rather than about the firm. It is also the document most likely to be checked line by line by a sponsor, a procurement team and a board member who was never on the original call. If it describes the client's problem in words they did not use, or names a priority they did not raise, the reader notices. The proposal then looks like a template with the client's name added, and the client starts to wonder what else has been assumed.

    Discovery calls give the firm the material to do better. The client has described their problem, the people involved, the decision they face and the constraints that matter to them. The task is to carry that language accurately into the proposal, to separate what the client said from what the firm infers, and to shape scope, approach and success measures around the client's own priorities. Done well, the reader sees their situation reflected back, in terms they would use themselves. Done badly, the reader sees the firm's assumptions, and the mismatch becomes the first thing they discuss.

    This article explains how to build a proposal from discovery notes and recordings. It covers how to capture the client's terms during the call, how to separate stated facts from interpretation, how to write the problem statement, how to map client language to each section, how to use quotations, how to keep scope and assumptions checkable, how to describe success and how to review the draft before it goes out. It includes a worked example and a checklist that a reviewer can use on any proposal.

    It is written for consultants, account leads and the people who edit their proposals. It sits alongside the article on turning call notes into accurate sales follow-ups, which covers the recap after a call, and the article on sales call templates for discovery notes, which covers how the call itself is structured. This article begins where those two finish: with the decision to write a proposal and the task of turning the conversation into a document a client can accept.

    Why the client's own words matter

    Clients judge a proposal partly on accuracy and partly on whether the firm understood them. A proposal that uses the client's terms signals that the firm listened. It also helps the client's internal sponsor, who may have to explain the document to a colleague, a finance committee or a board. If the sponsor recognises their own description of the problem, they can champion it. If they do not, they have to translate it, and translation is where meaning drifts.

    Client language also tests the firm's understanding. Compare two descriptions of the same problem. A consultant might write "the handover between regional teams is stalling". The client's own phrase, in the call, was "we keep losing things in the gap between the two regional teams". The first is correct, but the second reveals where the client feels the pain, which teams they hold responsible and what they would count as a fix. The detail that makes the problem specific is the detail the consultant's phrase removed.

    Client language also protects the firm. When a proposal is accepted, the language in it becomes the reference point for everything that follows. The steering group, the status reports and the final review will all be measured against the problem as described. If the proposal used the firm's own phrasing, the client may later say that the work solved a problem they never had. If it used their phrasing, the link between the work and the client's stated need is much easier to show.

    There is a limit, however. Client language can be vague, emotional or simply wrong. A client may call a problem "a data issue" when the evidence points to a process issue, or describe a deadline that has already moved. The aim is not to adopt every word uncritically. It is to start from the client's language, change it only for a reason the client can see, and make any change visible so that the client can disagree.

    Capture the client's terms during the call

    Good proposals start in the discovery notes. The notes should record the client's own words for the problem, the goals, the constraints and the people involved, with a marker showing which items are direct quotations and which are paraphrases. A consultant writing the proposal a week later should not have to guess whether a phrase was the client's or their own. If the call was not recorded, the difference matters even more, because the notes are the only record.

    Three kinds of term are worth capturing. The first is problem language: the words the client uses to describe what is not working, including the words they avoid. The second is outcome language: how they describe success, including any measures they already track. The third is internal vocabulary: the names of programmes, committees, systems and teams that the client uses every day and that an outsider would not know. Using those terms correctly tells the reader that the firm has learned the organisation, and it reduces the chance of misunderstanding about what is in or out of scope.

    A simple note format makes this easier. Each entry can have four parts: the term as spoken, the speaker's role, the context in which it was said and whether it was a direct quotation. For example, an entry might record that the operations lead used a particular phrase about a monthly report, that the phrase was said while describing a meeting, and that the notes capture it word for word. Entries like this are quick to write during the call and very useful afterwards.

    The notes should also record where each term came from. A phrase from the sponsor, a phrase from an operations lead and a phrase from a document shared before the call carry different weight. A proposal that mixes them without saying so may attribute a view to the wrong person. Keeping the source with the term is a small discipline that prevents a large class of errors.

    If a call was recorded and the firm is permitted to use the recording, a searchable transcript can help locate exact wording. Check the participant notice and the retention rules first. The principles in the consent, privacy and governance article apply to this use as much as to any other. Where a transcript is unavailable or not permitted, the consultant's own notes will have to do, and the proposal should be written with that limitation in mind. A proposal built on uncertain notes should say less, and ask more.

    Separate what was said from what you think

    Every proposal blends two things: facts the client has given and conclusions the firm has drawn. Blurring them is the most common way proposals become inaccurate. A sentence such as "your teams are struggling with duplicated reporting" may be an inference from one remark about a spreadsheet. If the client never said it, the proposal should not present it as their view.

    A simple marking system helps. In the draft notes, label each statement with one of four tags: stated by the client, shared in writing, observed by the firm, or inferred by the firm. The tags do not need to appear in the final document, but they show the writer which sentences need checking before the proposal is sent. A problem statement built mostly from stated items is strong. One built mostly from inferences should be tested with the client before it goes out.

    Inference is not a fault. A good consultant brings a view, and clients often hire a firm precisely to see what they cannot see from inside. The problem comes when an inference is presented as a fact, or attributed to the client. The fix is to write inferences as hypotheses that the work will test. For example: "we believe the duplicated reporting is contributing to the delay, and the first phase will test that belief with the teams involved". That sentence is honest about its status, and it gives the client something specific to confirm or correct.

    Observations need the same care. If the firm saw a document, the proposal should say which document and when it was seen. If the firm reviewed a dashboard during the call, the proposal should not imply that it reviewed the underlying data. Precise statements about what was seen build confidence, and vague ones invite questions the firm may not be able to answer.

    Write the problem statement first

    The problem statement is the section most likely to be read closely, and it sets the frame for everything else. It should describe what is not working, in the client's terms, followed by the impact they described and the constraints that shape the situation. It should not offer a solution, and it should not use the firm's categories unless the client has used them too.

    A useful structure has three parts. The first sentence states the problem in plain terms, using the client's words where they are clear. The second describes what the client has observed, with the sources of that observation. The third describes the impact, in the terms the client used, such as the effect on a deadline, a team's week or a board's confidence. Each part can be checked against the notes.

    Consider an example. The sponsor said the programme was behind "for reasons nobody can name". The operations lead described two teams sending each other different versions of the same status report. The finance lead said the board would need one report before the next quarter. A problem statement built from these might say that the programme is behind for reasons the sponsor has not yet been able to name, that the operations lead has seen two teams working from different versions of the status report, and that the board needs a single view before the next quarter. Every part of that statement can be traced to a remark in the call.

    Problem statements should avoid two common traps. The first is generalisation, in which the specific problem becomes a broad theme such as "governance challenges" or "alignment issues". Broad themes sound professional but cannot be tested. The second is overstatement, in which the firm's diagnosis is presented as the client's experience. A problem statement that is accurate and specific is more persuasive than one that is sweeping and unverifiable.

    Map the client's language to each section

    A proposal typically has sections for the problem, the objectives, the scope, the approach, the deliverables, the timetable, the team, the assumptions and the commercial terms. Each draws on different parts of the discovery notes, and each benefits from different client language.

    The objectives section should state what the client wants to achieve, in their outcome language. If success was described as "a single view of supplier risk before the board meets", the objective should say something close to that. Objectives written in standard firm phrasing, such as "to optimise governance", are vague, and a reader cannot tell whether they have been met. Objectives should be short, and each should match a need the client stated.

    The scope section should name the teams, systems and locations that the client uses. This is where precision matters most, because scope is where disagreement arises later. If the client spoke of "the three regional sites", the proposal should name those three sites rather than refer to "all relevant locations". If the client uses an internal name for a report, the proposal should use that name, with a short description so that a newcomer can follow it.

    The approach and deliverables sections can use the firm's own method, but the method should be explained in terms the client will recognise. A framework name helps only when the reader knows what it means and why it fits their problem. Otherwise, describe what the team will do in plain steps and mention the framework in a single sentence. Deliverables should be named as the client would name them, and described in enough detail that the client knows what they will receive.

    The timetable should reflect the client's constraints, such as a board date, a contract renewal or a regulatory deadline, described in their words. A timetable that ignores a date the client called important will be questioned at once, and a timetable that quietly moves the client's date will damage trust faster than almost any other error.

    The team section should describe the people who will do the work in their roles, not in grand titles. It is also the place to be honest about the client's own team: which of their people the work will need, how much of their time it will take and who will be the single point of contact.

    Using quotations carefully

    A short quotation can make a proposal feel grounded, because it shows the reader that the firm has listened. It can also cause harm if it is taken out of context, embarrasses the person who said it or reveals something said in confidence. Quotations should be used with care, and the default should be to paraphrase.

    Keep quotations short, a sentence or less, and use them only for the problem statement or for a success measure. Attribute them to a role rather than a name unless the client has agreed otherwise, so that a sponsor is not exposed by the document. Check each quotation against the notes or recording, and make sure the words are exact. A quotation that has been tidied up is no longer a quotation. If the speaker used a word that is unkind about a supplier, colleague or previous project, paraphrase it.

    Before using any quotation, check that the client is comfortable with it appearing in a document others may read. Many clients are content to be quoted in a proposal that stays inside their organisation. Some are not, particularly when the words are critical or when the proposal will be shared with a wider group, such as a board pack or a procurement panel. If in doubt, paraphrase and ask.

    Never put words in the client's mouth. A quotation the client did not say, even if it reflects what they meant, undermines the trust the proposal depends on. A paraphrase should never be formatted as a quotation, and a summary of a discussion should not use quotation marks around words the consultant chose.

    A useful test is to read each quotation aloud to a colleague who was on the call, and ask whether they would recognise the words as the client's. If the answer is no, the quotation needs checking. If the answer is yes, but the colleague says the meaning has shifted, the quotation may be accurate but misleading, and it should be rewritten or removed.

    Scope and assumptions drawn from the call

    Scope problems often begin in the proposal. A discovery call may range across many topics, and the proposal has to decide which of them the firm will do. Writing scope in the client's language helps, but it is not enough on its own. Scope has to be checkable, bounded and clear about what is excluded, so that both parties can tell at the end whether the work was delivered as agreed.

    Checkable scope lists what the firm will do with enough detail for the client to verify it. "Interview the programme sponsor, the finance lead and up to eight operational leads" can be checked against a calendar. "Support the programme" cannot. Each scope item should describe an activity, a quantity or a deliverable, and it should use the names the client uses for people, teams and documents.

    Bounded scope sets limits on quantity and coverage. A proposal might limit the number of interviews, workshops, documents reviewed, revision rounds or sites covered. Limits do not signal distrust. They make the work finishable, and they give both parties a clear point at which a request becomes a change. Words such as "unlimited", "as needed" and "reasonable assistance" should be avoided, because they make it impossible to tell whether the work is complete.

    Exclusions name the work a client might reasonably assume is included but is not. In a programme review, those might include the implementation of recommendations, the configuration of systems, the migration of data or the management of the programme after the review. Exclusions should be specific to the client's situation. A generic line such as "anything not mentioned is excluded" helps very little, because it does not tell the client where the boundary sits.

    Assumptions tie the proposal to the client's responsibilities. If the work depends on the client providing current reports by a certain date, appointing a single decision-maker or consolidating feedback within a set time, those dependencies belong in the document. Assumptions drawn from the call are often the most useful, because the client has already said what they can and cannot provide. Writing them down makes clear what happens if those conditions change, and it gives the firm a fair basis for adjusting the timetable.

    Change control should be stated as well. A proposal that explains how new requests will be handled, through a written change order showing the effect on fees and timescales, reduces the chance that small requests quietly enlarge the work. Guidance on consulting statements of work makes the same point: scope that is specific, bounded and change-controlled is easier to deliver and easier to defend. That is a practical reason to take time over the scope section, rather than treating it as boilerplate.

    Describe success in the client's measures

    Success measures are where proposals most often drift into generic language. Clients usually have a sense of what good looks like, even if they have not written it down. They may track a figure, a deadline, a satisfaction score or a decision at a particular meeting. The proposal should use those measures wherever they exist, in the form the client already uses.

    Where the client has no measure, the firm can suggest one, but should say so and ask the client to agree. A measure such as "the steering group makes the supplier decision at its next meeting, with the risk register agreed beforehand" is specific and testable. A measure such as "improved stakeholder alignment" is not, because nobody can say at the end whether it was achieved. The best measures are tied to a decision, a document or a date that the client already cares about.

    The firm should also avoid promising results it cannot control. A proposal can commit to an assessment, a plan, a set of recommendations or a facilitated decision. It should not promise that the client's business will improve by a particular amount, unless the evidence and the arrangement genuinely support that claim and the client has accepted the risk. Over-claiming is one of the fastest ways to lose a client's trust once work has started, and it is hard to recover from.

    Measures should be reviewed when the work starts. If the client's measure turns out to be impossible to collect, or if the data needed for it sits with a team that is not in scope, the proposal should be updated through the change process, not quietly reinterpreted at the end.

    The commercial section

    The commercial section is where the firm sets out its fees, payment terms and any conditions attached to them. Those terms are usually set by the firm's own commercial process and approved by the people who own it. This article does not describe any particular pricing approach, and a proposal writer should not invent terms to match a client's expectations.

    The link to discovery matters here in one way. Commercial terms should be consistent with the scope, the assumptions and the timetable in the rest of the document. If the scope assumes that the client will provide data by a certain date, and the fee assumes a shorter timetable, the proposal contradicts itself. Reviewers should read the commercial section against the scope before the proposal is sent, and check that every item referred to in one section appears in the other.

    Where the client has raised a concern about cost during the call, the proposal should address it in the client's terms, and it should not pre-empt the firm's commercial process. A note that explains what is included, what is excluded and how changes are handled is usually more useful than a long justification of a figure.

    Writing for readers who were not on the call

    The proposal's readers are often not the people who attended the discovery call. A procurement officer may check the commercial terms, a legal reviewer may read the assumptions and a board member may read only the summary. Each needs the document to make sense without the call.

    That means defining any term the client uses in an unusual way and explaining any internal acronym the firm has used. It means stating the problem in a few sentences that a newcomer can follow, and avoiding phrases such as "as we discussed" without saying what was discussed. The proposal should carry its own context, because the reader may share it with people who never met the firm.

    Plain English helps. The GOV.UK style guidance, written for public sector content, asks writers to write for the reader and to use the words that the reader uses and understands. That discipline suits a consulting proposal well. Short sentences, defined terms and active verbs make the document easier to check, and they make it harder to hide a vague claim.

    A summary at the front is valuable, but it must match the body. Readers who stop after the first page will form a view of the whole proposal from it. The summary should state the problem, the objectives, the approach and the main assumptions in the same words the body uses. A summary that is more confident than the body is a warning sign.

    A worked example

    Consider a hypothetical firm advising an organisation whose change programme is running late. In the discovery call, the sponsor says the programme is behind "for reasons nobody can name". The operations lead says two teams keep sending each other different versions of the same status report. The finance lead asks whether the programme can report to the board in a single format before the next quarter.

    A first draft, written from memory and the firm's standard template, describes "governance and reporting challenges" and proposes "a comprehensive programme assessment and optimisation roadmap". The scope lists "stakeholder engagement" and "best-practice review" without naming any stakeholders or practices. The timetable is generic. Read back, the draft does not contain the sponsor's problem, the operations lead's observation or the finance lead's deadline. A reviewer would ask which of the client's own words the proposal used, and the answer would be none.

    A revised draft starts from the client's words. The problem section says the programme is behind for reasons the sponsor has not yet been able to name, and it records the operations lead's observation that two teams work from different versions of the status report. It marks the duplicated report as an inference to be tested, rather than a settled fact, and it states the test that will confirm or correct it. The objective states that the board will receive a single status report before the next quarter, in the format the finance lead described. The scope names the two teams and the current reports, and it lists the interviews by role. The exclusions state that the firm will not redesign the programme's systems or manage the programme after the review. The assumptions say that the client will provide the current reports by a date the sponsor agreed on the call, and that a single contact will consolidate feedback.

    The revised draft is longer in places, but it is shorter in the ways that matter. It is more specific, easier to check and gives the client something to correct. If the sponsor says the duplicated report is not the real issue, the approach can be adjusted before work begins. That is far better than discovering the mismatch at the first steering meeting, when the firm is already committed to a plan.

    The worked example also shows a practical point. The revision did not require new information. Everything it added came from the notes that already existed. The difference lay in using them.

    When several stakeholders use different words

    Many engagements involve more than one client voice, and those voices often describe the same problem differently. The sponsor may speak of delivery, the finance lead of cost and the operations lead of handovers. All three may be right, and a proposal that chooses one vocabulary will leave the other two readers feeling unheard. The writer's task is to show the connection between the terms, not to pick a winner.

    A practical method is to build a small glossary from the discovery notes. Each entry lists a term the client used, the role of the person who used it, the meaning as they explained it and any other term that appears to refer to the same thing. The glossary is for the writer, not the client, but it shows where the vocabulary overlaps and where it diverges. Where two stakeholders mean different things by the same word, the proposal should say so, and the approach should include a step to agree the meaning.

    Consider a hypothetical case in which the sponsor describes a "readiness" problem, the finance lead describes "cost certainty" and the operations lead describes "missed handovers". A proposal that uses only the sponsor's word will leave the finance lead wondering whether cost is in scope. A proposal that lists all three, and explains how the work will test whether they share a cause, gives each reader a place to see their concern. The approach can then include a short session to agree how the terms relate, which is usually more useful than any single definition.

    Stakeholders may also disagree about the problem. One person may believe the problem is a delay in decisions, and another may believe it is a lack of information. A good proposal records the disagreement neutrally, uses both descriptions in the problem statement with their sources, and frames the first phase as a way to test which account is right. Presenting a disagreement as a settled point, in favour of one stakeholder, is a fast route to losing the other.

    Common drafting mistakes

    Certain mistakes recur across proposals, and most of them can be avoided with a short review. The list below is drawn from the kinds of problems that tend to surface when proposals are compared with discovery notes, and it is a useful checklist for any writer.

    • Borrowed paragraphs. A paragraph taken from an earlier proposal carries that client's language, assumptions and sometimes details, which will not match the new client. Write each problem statement from the new client's notes.
    • Generic objectives. Phrases such as "optimise", "transform" and "enhance" say little on their own. Replace them with the outcome the client described.
    • Hidden scope. A deliverable that is mentioned in the approach but not in the scope section creates an unagreed obligation. Every deliverable should appear in both places, with the same name.
    • Missing dates. A proposal that refers to "the next quarter" without saying which quarter, or to "the board" without naming its date, leaves the reader to guess. Use the dates the client gave.
    • Confident inference. A claim about the client's internal position, presented as fact, will be challenged by someone who knows better. Mark it as an inference or remove it.
    • Unagreed roles. A proposal that assigns the client's staff to tasks they have not accepted sets up a dependency that may never be met. Name the client's responsibilities only after they have been discussed.
    • Vanishing terms. A term defined in the problem section and then used differently later causes confusion. Use each term consistently, or define the change.

    Each mistake is easy to spot once it is named. The discipline lies in checking for them before the proposal is sent, not after the client has read it.

    Checking the draft before it goes out

    Before a proposal is sent, check it against the discovery notes. A reviewer can work through a short list, and a proposal should pass every item before it leaves the firm.

    • Does each quotation match the notes or recording exactly, and is the speaker comfortable with its use?
    • Does each stated problem trace to a remark, document or observation in the notes?
    • Is every inferred statement written as a hypothesis, with a test or question attached?
    • Does the objective use the outcome language the client used, or explain why it does not?
    • Does each item in scope correspond to something the client asked for, and is it described in the client's names?
    • Does each exclusion correspond to something the client might reasonably expect to be included?
    • Does each assumption reflect a responsibility the client has accepted or that they have said they can meet?
    • Do the timetable and any dates match the constraints the client described?
    • Do the commercial terms agree with the scope, the assumptions and the timetable?
    • Are all success measures stated in a form that can be checked at the end?

    After the checklist, ask a colleague who was not on the call to read the proposal and say what they think the problem is, what the firm will do and what the client must do. If their answers differ from the firm's intent, the document needs more work. A reviewer outside the deal is often the best test of clarity, because they have no memory of the conversation to fill the gaps.

    Keep the review proportionate. A large proposal with significant fees deserves a thorough check, including a line-by-line comparison with the notes. A short follow-on proposal for a familiar client may need only a quick comparison of the key sections. The principle is the same in both cases: the proposal should be accurate about what was said, clear about what is offered and honest about what is not yet known.

    Sending the draft back to the client

    Some firms share a short draft of the problem statement and the assumptions with the client before they write the full proposal. This is a useful step, because it allows the client to correct the firm's understanding early and at low cost. A draft problem statement of a page, sent with a simple question about whether it is right, often produces more useful feedback than a finished proposal.

    The request should be specific. Ask the client to confirm the problem as written, to correct any term they would describe differently and to say whether any inference is wrong. Avoid asking a general question such as "does this look OK?", which tends to produce polite agreement without real checking. A short reply that confirms the facts is far more valuable than a long reply that accepts everything.

    Where the client disagrees, the firm should treat the disagreement as information. A correction to the problem statement changes the scope, the approach and the measures, so it is better to find it early than to discover it in the proposal's acceptance meeting. The firm should record the correction and the reason for the change, so that the record of the discussion stays accurate.

    Learning from each proposal

    Once a client has responded, the firm can compare the proposal with the reply. Did the client correct any part of the problem statement? Did they query the scope or the assumptions? Did they repeat a phrase from the proposal back in their own words? Those signals show where the firm's understanding matched the client's and where it did not.

    A simple log of outcomes, with notes on which client phrases carried through and which sections were questioned, can show patterns over time. A firm might notice that proposals which quoted the client's problem language were accepted more quickly, or that scope questions clustered around a particular kind of exclusion. Patterns like these help the firm improve its templates and its note-taking, and they are more useful than any single case.

    The log should be used to improve practice, not to rank the individuals who write proposals. The aim is to learn how the firm listens, not to score the people doing the listening. A proposal that was declined may have been declined for reasons unrelated to its accuracy, and a proposal that was accepted may still contain errors that nobody noticed. The log is a tool for learning, and it works best when it records what happened without assigning blame.

    Carrying the language into the first meeting

    A proposal's language does not stop at acceptance. The first steering or kick-off meeting is the earliest test of whether the firm understood the client, and the words used in the proposal are the natural starting point for the agenda. An agenda that repeats the proposal's problem statement, objectives and assumptions tells the client that the document is a working agreement rather than a sales artefact.

    The first meeting should check three things. It should confirm the problem statement in the client's terms, ideally by asking the sponsor to restate it in their own words. It should confirm the assumptions, including the dates the client has agreed to meet, the data they will provide and the person who will consolidate feedback. And it should agree how the scope will be tracked during the work, so that any request can be placed against the written scope when it arrives.

    Keep a record of the outcome. If the sponsor restates the problem differently from the proposal, the difference should be noted, and the proposal updated through the change process if it matters. A small discrepancy at the start is cheap to fix. The same discrepancy discovered at the final review can undo months of work and goodwill.

    Consultants sometimes find that the client's team has moved on since the proposal was written, with new people in roles or a changed timetable. In that case, the first meeting is a chance to re-confirm the language with the people now involved, and to explain which parts of the proposal still hold. Presenting the proposal as a living statement, rather than a contract to be enforced, helps the client engage with it honestly.

    Keeping the client at the centre

    A proposal written from discovery calls is listening made visible. The client should be able to read it, recognise their problem, their priorities and their constraints, and see them stated accurately in terms they would use themselves. Where the firm has added its own view, the document should say so, and the client should have a clear chance to correct it.

    The discipline is simple to describe and harder to practise. Capture the client's language during the call. Separate what was said from what was inferred. Write the problem statement from the notes, and map the language carefully to each section. Use quotations with care. Write scope and assumptions that can be checked. Describe success in the client's measures. Then test the draft against the notes before it leaves the firm. A proposal built this way is more accurate, more persuasive and far easier to deliver, because the work that follows is measured against a problem the client recognises as their own.

    Frequently asked questions

    Should I quote the client directly in a proposal?

    Yes, sparingly, if the quotation is short, exact and approved for use. Attribute it to a role rather than a name where possible, and check that the client is comfortable with it appearing in a document others may read. Do not change the words, and do not present a paraphrase as a quotation.

    How do I avoid presenting my own assumptions as the client's view?

    Mark each statement in the notes as stated by the client, shared in writing, observed or inferred. Write inferences as hypotheses that the work will test, and ask the client to confirm them. Anything the client has not said should not be attributed to them.

    What makes a proposal scope checkable?

    Scope is checkable when the client can verify each item against a defined activity, quantity or deliverable. Name the teams, sites, interviews, workshops and documents involved, and state what is excluded. Add assumptions about the client's responsibilities, and a written change process for new requests.

    What if the client's own language is vague?

    Start from their language, then ask a specific question to make it concrete, such as what would be different once the problem was solved. Where you change a term, make the change visible and check it with the client. A proposal should reflect the client's meaning, not the firm's preferred vocabulary.