Capturing Expertise Before Someone Leaves
How HR and managers can capture tacit expertise from experienced staff before a departure or long leave, with consent, clear access rules and short retention.
Many organisations find out what an experienced colleague knew only after that person has gone. A supplier contact stops answering. A pricing exception nobody can explain turns up in a contract. A decision made three years ago gets reopened because the only person who understood the trade-off has left. This is common, and most of it is avoidable if the knowledge is examined before the last day rather than after it.
The problem is rarely that the knowledge was secret. More often it was never written down because it lived in the daily habits of one person, and nobody had a reason to ask for it until the reason arrived as a resignation, a retirement, a long period of illness or a secondment that lasted longer than anyone expected. By then the window for a calm conversation has mostly closed, and the work has to be reconstructed from whatever records happen to exist.
This article is for HR, learning and development (L&D) and onboarding teams, and for the managers they support. It covers how to decide whose knowledge is at risk, how past meeting records can help find decisions that only one person understood, how to run knowledge interviews and handover sessions, and how to get consent and keep the record usable by someone who was never in the room. It also covers what to do when the approach does not fit a team of four or a division of several hundred, and how to review the process so it improves. Meeting intelligence is one way to support this work. It is not the only way, and it does not replace the conversations that make a transfer succeed.
Why the most valuable knowledge is the hardest to write down
Explicit knowledge can be written into a procedure or a template. Tacit knowledge is the judgement behind it: which customer will push back on a clause, why one region skips an approval step, what a manager means when they say "let's wait and see".
A 2023 systematic review of 91 empirical studies on knowledge loss caused by staff turnover, published in The Learning Organization by N. Galan, found that the effect depends on the type of knowledge lost, the departing person's role, who replaces them and whether colleagues can absorb what was lost. The review also found that tacit knowledge is generally harder to formalise and transfer than explicit knowledge. For HR and L&D teams, the practical reading is that a folder of documents rarely closes the gap on its own. The transfer needs time, conversation and some follow-up.
Three kinds of knowledge that go missing
It helps to sort what you are trying to capture into three rough kinds, because each one needs a different method. This split is our suggestion for planning, not a formal taxonomy from the literature.
- Procedural knowledge: the steps of a process. It is usually written down somewhere, even if the documents are out of date.
- Contextual knowledge: the reasons behind a decision or exception, the history of a supplier or customer, and the constraints that shaped an approach.
- Relational knowledge: who to call, who must be consulted before a change, and how a particular stakeholder prefers to be approached.
Procedural knowledge is the easiest to capture and is where most teams start. Contextual and relational knowledge is where losses hurt most, because it is rarely written and is often held by one person. Most of the effort in expertise capture should go into the second and third kinds.
Why documents alone fail
A document records what was decided. It rarely records what was rejected, who objected, what would make the decision worth revisiting, or which informal arrangement made it workable. A successor who reads a clean procedure may follow it faithfully and still make the wrong call in the first case that does not fit the template. The gap is the reasoning, and reasoning tends to come out most reliably in conversation.
Teams also tend to overestimate how well their knowledge is recorded. A quick test is useful before deciding how much effort the project needs. Pick three decisions the team still relies on, and ask whether a new person could find the reason for each within ten minutes using only the existing records. Our suggestion is that if the answer is no for most of the three, the project is justified. If the answer is yes for all three, the effort is better spent on the people and relationships that the records cannot show.
Deciding whose knowledge is at risk
The useful question is not "who is senior?" but "whose absence would stop something important from working, or leave a decision hard to explain?" Seniority is a weak signal. A junior administrator who is the only person who can run a legacy export may be a bigger risk than a director whose responsibilities are well documented and widely shared.
Three questions help narrow the list.
First, what does this person do that nobody else does in the same way? Look for specialist systems, unusual supplier arrangements, regulatory duties or recurring work that has never been written up. Second, who do they speak to that others do not? A long-standing relationship with a key stakeholder is a risk even when the job title looks ordinary. Third, what would a successor find surprising in their first month? If the honest answer is a list of things they would have to rediscover the hard way, the person is a priority.
Managers should take part, but the decision should not rest on one person's judgement. A short structured conversation with the manager, a peer and, where appropriate, the person themselves gives a more balanced picture. Keep the purpose narrow: the aim is to protect the work, not to rank the person. Once the list is agreed, it should describe pieces of work and their dependencies, not the people who hold them.
Three questions in more detail
Each question produces a different kind of output, so it helps to write the answers down in a particular form.
For the first question, write one line per piece of work, and note who could do it if needed. A common mistake is to list only grand responsibilities, such as "manages the supplier", when the real risk is a fortnightly reconciliation that exists in one spreadsheet.
For the second question, mark the stakeholders where only one person has the relationship. The point is to identify where a relationship would be lost, not to judge how well it is run.
For the third question, ask a named successor or a peer who would cover in an emergency. A surprise that repeats across several interviews points to a real risk.
A risk sheet for the work
A short sheet, filled in once per piece of work, is easier to agree than an open discussion. The following is a suggested layout, not a required template.
- Work item: the task or responsibility, in one line.
- Frequency: daily, weekly, monthly, quarterly, or event-driven.
- Systems and suppliers involved: the tools, contracts and contacts.
- Who holds the knowledge today: the person, plus any documents that describe it.
- Who could cover it: a named colleague, or "nobody identified".
- Decisions in force: the key choices that shape how the work runs, with links to the meeting record where they were made.
- Stakeholders who depend on it: the people or teams who would notice a gap first.
- Risk rating for the team: high, medium or low, agreed by the group rather than set by one person.
- Action: capture now, cross-train, document, or accept the risk.
Keep the sheet about the work. If a field starts to describe how well someone performs, remove it.
Hypothetical scenario: finance operations
Hypothetical example: a finance operations team has three people who run month-end close. One is retiring in four months, and she is the only person who knows how to reconcile a legacy intercompany account restructured in an old system. The team agrees that her knowledge is the priority and builds the rest of the plan around it.
In this case the risk sheet makes the priority obvious. The reconciliation is monthly, one person holds it, nobody has been named to cover it, and the account is referenced in two steering group decisions. Those decisions are where the reasons live, so the team searches the meeting records for the account name and the restructuring project to find the dates. The retiring colleague is then asked to walk through the reconciliation with a successor during the final three months, and the steering group decisions are summarised into a short register that the successor can read on their own.
The lesson is that the reconciliation itself is not the hardest part. Knowing which of the two decisions still holds, and why the account was set up the way it was, is what the successor could not have found from the spreadsheet alone.
Hypothetical scenario: a two-person support team
Hypothetical example: a support team of two handles every escalated enterprise ticket. One colleague is planning a long period of leave for a family reason, and no date has been set for her return. The manager does not want to rank either person. Instead, the team completes the risk sheet for the escalation work alone, and finds that the second colleague already knows most of the procedure but has never spoken to the two largest customers' technical contacts.
Here the team is small, so the plan is modest. The second colleague shadows the calls with those two contacts over three weeks, with the first colleague's agreement and the contacts informed that a colleague will be covering. No interview programme is needed. The record is a single page, kept for the length of the leave and reviewed when it ends.
If the first list is too long to act on, our suggestion is to rank entries by how hard the work would be to rebuild and how soon the gap would appear, then start with the items that are both hard and soon.
Using past meetings to find decisions only one person understood
Meeting records are useful because they show where decisions were actually made, not only where they were later described. A decision recorded in a steering group or a series of supplier calls often carries context that a formal document leaves out: who raised the objection, which alternative was rejected and why, and what would make the decision worth revisiting.
Meeting intelligence software can make past meetings easier to search by topic, date or participant group, so a reviewer can find where a decision was discussed. The output is a list of candidate decisions to check with the person who knows them, not a verdict on what was right. Confirm every summary against its source, because summaries can omit caveats, misattribute a point or describe a provisional idea as settled.
A practical approach is to work backwards from the decisions the team still depends on. Ask the reviewer to list ten or fifteen decisions that most affect current work, then find the meetings where each was discussed. For each one, note the decision in a sentence, the date and forum, the reasons given including anything rejected, and the condition for review. These four fields become the agenda for the knowledge interview, and they show the person what has already been found, which makes the session more focused.
A step-by-step review
The following sequence is a workable way to run the review. Our suggestion is to time-box it to about two days of reviewer effort for a team of up to ten people, and to adjust for larger or smaller groups.
- Choose the period. Start with the last twelve months, or the period since the last major change if that is shorter. Extend it only if the review finds the decisions it needs.
- Choose the forums. List the recurring meetings that touch the work: steering groups, supplier calls, client reviews, team meetings and any project meetings with decision logs.
- Search by topic. Use the names of systems, suppliers, customers and projects from the risk sheet as search terms.
- Note candidate decisions. For each meeting that matters, record the date, the forum, the decision or commitment, and the reasons given.
- Flag reversals and caveats. Mark any point where a decision was reversed, paused, made provisional or made subject to a condition.
- Check against the source. Open the recording or the original notes for every entry that will go into the interview agenda.
- Hand over the list. Give the reviewer's list to the person leaving, and ask them to confirm, correct and extend it.
The review will miss reversals if it searches only for the original topic, and it will miss decisions made on the phone or in unrecorded one-to-ones. Treat the list as a starting point, and let the interview surface what the records cannot show.
Running structured knowledge interviews
A knowledge interview is a planned conversation with one purpose: to get the departing person's understanding of the work into a form someone else can use. It is not an appraisal or an open chat. Schedule two or three sessions of about sixty to ninety minutes, spaced over several weeks, rather than one long session in the final week. Our suggestion is that spacing matters because the person needs time to remember things they stopped thinking about, and the successor needs time to come back with questions.
Preparing the interview
Before the first session, the interviewer should do three things. They should read the decision list and the risk sheet, so they know what the person has already been asked about. They should agree with the person how the notes will be stored and who will see them, so the conversation is not disrupted by a question about that later. And they should choose a quiet room or a call with no other demands on the person's attention.
The interviewer should also be clear about their own role. The interviewer is capturing understanding. They are not evaluating the person, and they are not the successor's line manager. If the interviewer is the person's own manager, say so at the start and consider whether another interviewer would make the conversation easier.
Question bank
Start each session with the list of decisions and topics from the review. Ask the person to explain each one in their own words, then ask questions that tend to surface tacit knowledge. The questions below are a starting set, not a script.
- What would make you change this decision?
- What have you seen go wrong when someone tried to do this differently?
- Who should be consulted before anything changes, and what do they care about?
- What do people usually get wrong when they first take this on?
- Is there an exception you apply that is not written down anywhere?
- Which parts of this process depend on something that is not a system, such as a phone call, a favour or a standing arrangement?
- What did the team try before the current approach, and why was it dropped?
- If the person who asked for this originally came back, what would they say about how it is run now?
- What is the first thing you would check if this broke on a Monday morning?
- Who would you ask for help if you were no longer here?
Interviewers should listen more than they talk and should not correct the person's approach during the session. The aim is to capture how they think. Evaluation can come later, with the successor and the manager. If the person offers a view on a colleague, note it only if it is about the work, and keep the note at the level of the decision or the process.
Hypothetical scenario: the exception that was never written down
Hypothetical example: during the interview about a supplier contract, the departing person mentions that the team accepts late delivery notices by phone, but only from one named contact, and only when the notice is given before a set cut-off time. This exception appears nowhere in the contract summary. The interviewer records it as a contextual item, marks it as confirmed by the person, and adds a question for the successor: whether the arrangement is still known to the supplier, and whether it should be written into the process or retired.
The example shows why the interview matters. The meeting records mention the supplier, but only the person knew the arrangement existed. The next step is not to judge whether the exception is wise. It is to make the successor aware of it and to decide, with the relevant stakeholders, what to do.
Write-up and confirmation
Write up each session within two working days, while the wording is fresh, and send it back to the person to check. People often remember a caveat differently a week later, so a corrected record is far more useful than an unchecked one. Store the confirmed version where the successor can find it, and record the date it was confirmed.
A write-up should separate four things: what the person said, what the interviewer inferred, what is still uncertain, and what needs checking with another person. Mixing these makes the record look more certain than it is. Use the person's own words where they are short and clear, and paraphrase where they are long, marking the difference if it matters.
Handover sessions that work in practice
Knowledge interviews capture thinking. Handover sessions transfer working knowledge. The outgoing person walks through a live piece of work while the successor watches, then does part of the task while the outgoing person is on hand to answer questions. The two activities complement each other. An interview tells the successor why something is done. A handover shows them how, in the messy version that exists in practice.
Shadowing is the most reliable format: the successor sits in on the meetings and calls the outgoing person handles, and the two debrief afterwards. A supervised run-through, where the successor does the task with the outgoing person available, comes next. Recorded walkthroughs can supplement these, but they cannot answer questions, so they should not replace live sessions.
A procedure for a handover session
- Agree the purpose and the output in advance, for example "the successor will produce the monthly report without help by the end of week four".
- Share the agenda, the materials and the systems access needed, and check the access before the session starts.
- Walk through the task once at normal speed while the successor watches and takes notes.
- Walk through it again slowly, pausing at each decision point to explain why it is made that way.
- Let the successor do the task, with the outgoing person available but silent unless asked.
- Debrief within the same day: what went well, what was missing, what should be written down.
- Log the session, the date and the open questions in the handover record.
Set dates. A handover planned for "whenever there is time" often never happens. Put the sessions in calendars, name the successor and the outgoing person, and note what should be transferred by each date.
Getting consent before anything is recorded
Recording a knowledge interview, or analysing meetings that involve a member of staff, processes personal data. People reasonably expect that what they say in a work conversation will be used for the purpose they were told about, and no other.
The ICO's guidance on monitoring workers is a useful reference for the questions to answer. It says workers generally need to be told about monitoring in accessible privacy information, including what is monitored, why, and how the information will be used. It also says an appropriate lawful basis must be identified and documented, the approach must be necessary and proportionate, and information should not be kept longer than the purpose requires. Knowledge capture is not the same as workplace monitoring, but the same questions apply. HR teams should take their own legal advice rather than treat any guidance as a checklist.
What the consent conversation should cover
A consent conversation should cover what is captured (notes, a recording, the meeting records used, or a mix), why it is captured in one sentence the person can repeat, who can see it and in what form, how long it will be kept, and what happens afterwards. The person should know they can correct the record or withdraw part of it, and that it will not be used to assess their performance or decide pay or conduct.
Use the following as a checklist for the conversation. Record that it took place, and keep the confirmation in writing.
- What is captured: interview notes, recordings, existing meeting records, or a combination.
- Purpose: one sentence, such as "so that the team can keep running the supplier contract after the handover".
- Who can see it: the named successor, the manager, the reviewer and any named HR contact.
- Retention: the date on which detailed material will be deleted.
- Use limits: not for performance management, pay, conduct or promotion decisions.
- Correction and withdrawal: how the person can change a note, and how they can ask for part of it to be removed.
- Questions: an invitation to ask anything, and a named person to ask later.
- Written confirmation: a short note of what was agreed, signed or acknowledged by the person.
Sceptical questions a reader might ask
Several objections come up whenever this work is discussed, and they deserve direct answers.
Is this just surveillance with a nicer name? It is a fair question. The answer depends on what is captured and why. Knowledge capture that focuses on decisions, procedures and relationships in the work, with a defined end date and no use for assessment, is a different activity from monitoring how an individual speaks or behaves. If the project starts to collect data about how someone performs, it has changed purpose and needs a fresh consent conversation, or it should stop.
Can the successor use the records to judge the person who left? No. The records exist to protect the work. If a successor or manager wants to compare how the work was done, the discussion belongs in a process review about the work, not in a review of the individual.
If someone does not want to take part
If someone does not want to take part, the project should go ahead without their contribution, not under pressure. The team can document the work from its side, and the reviewer can work from existing records with suitable safeguards. Declining should never affect notice, references or final pay.
It helps to plan for this case in advance. Our suggestion is to have a fallback that uses only records the organisation already holds for business reasons, with the reviewer checking the material against the source, and to tell the person what will be used and how. The person's refusal should be recorded as a choice, not as a gap to be filled quietly.
Keeping the record usable for someone who was never in the room
A record is only useful if the person reading it can act on it. The successor was not in the meetings, does not know the stakeholders and may not know the history. The record should answer their questions in the order they will arise.
A simple structure works: a short summary of what the person did and what is being handed over; then the open items, the decisions still in force, the key stakeholders and what each one cares about, and the known risks. Put the detail and meeting references in an appendix. Someone with ten minutes should grasp the main points, and someone with a week should be able to find the evidence behind each one.
A suggested record layout
- Summary: what the work is, why it matters, and who depends on it, in about two hundred words.
- Open items: each with an owner, a date, the status and the next step.
- Decisions in force: each with the date, the forum, the reasons, the conditions at the time, and the review trigger.
- Stakeholders: the people or teams involved, what each cares about, and how they prefer to be contacted.
- Known risks: things that could go wrong, with early signs to watch for.
- Exceptions and workarounds: anything the standard process does not cover.
- Systems and access: where things live, who has access, and what needs renewing.
- Appendix: meeting references, document links, and the interview write-ups in confirmed form.
Every entry should carry the date it was last confirmed, who confirmed it, and the condition under which it should be reviewed. Without these, a decision that was right two years ago can quietly become wrong. Spell out acronyms and internal labels, and link to source material rather than paraphrasing it.
For a team that already keeps a decision log, the register can often be built on top of it. The decision log article describes how a searchable log can support this, and the stakeholder view in stakeholder mapping from meeting records can feed the stakeholder section.
Testing the record with the successor
The successor should read the record before the handover closes and answer three questions in writing: what would you do first, what is unclear, and what did you look for that was not there. Their answers are the best test of whether the record works. If the successor cannot find the reason for a decision within ten minutes, the record needs another pass.
Retention and access: keep them short and controlled
Expertise records often become permanent folders because nobody decides when they should go. That creates two problems: the record can hold personal data that is no longer needed, and people who should no longer have access can still read it.
Set the retention period before the project starts. A period matching the handover window plus a short review is often enough. After that, delete the interview notes and recordings, and keep only confirmed business content if it is still needed. Put the deletion date in the project plan so it is a scheduled task, not a memory.
A retention schedule should give each item a stated end. Our suggestion is to delete interview recordings once the write-ups are confirmed, delete meeting extracts once the register is confirmed unless they are needed as business records elsewhere, and keep the confirmed handover register only as long as the work it describes is live. The periods should be set by your organisation, with legal advice where needed.
Access rules as a list
- Named successor: read and edit access to the handover register and confirmed interview write-ups.
- Manager: read access to the register and the open items, and the ability to approve the final version.
- Reviewer: access to the meeting extracts and the working notes during the review only.
- Named HR contact: access to consent records and the retention schedule.
- Everyone else: no access to individual interview notes. Decisions and commitments can be shared with the wider team in summary, without the notes behind them.
- Review: access is reviewed on the day the handover closes, and removed where it is no longer needed.
Limit access to the successor, the manager, the reviewer and, where relevant, a named HR contact. Review access when the handover ends. Do not share individual interview notes with the wider team, and never make them available for performance or disciplinary purposes. Before any records are imported, check that the access settings in whichever tool you use match the rules agreed for the project.
What meeting insight should not do here
Meeting insight is useful for finding where decisions were made and which topics recur. It might show that a supplier issue has come up in six meetings over two years and has only ever been resolved by one person. That is a team-level pattern, and it is exactly what this work needs.
It should not be used to rate an individual. Counting how often someone spoke, scoring their tone or comparing their contributions with colleagues has no place in knowledge capture, and it would damage the trust the project depends on. People who expect to be assessed from their meeting content become less candid, and the record becomes thinner. The purpose is the work, not the person. The article on keeping meeting data out of performance ratings sets out the reasoning in more detail.
Nor can a summary replace the human steps. It cannot explain why a decision was unpopular at the time, which relationship made it possible, or what informal understanding sits behind a formal approval. Those come from the interview and the handover. The meeting record is the map that helps you ask the right questions.
Signs that the project has drifted
Watch for these signs, which suggest that the project has moved from capturing knowledge to assessing people.
- The reviewer starts keeping notes on how often a named person speaks.
- The risk sheet gains a field about performance, reliability or attitude.
- The interview write-ups include judgements about colleagues that have no bearing on the work.
- Managers ask for the meeting extracts to prepare for a review conversation.
- The successor is asked to compare their meeting behaviour with the departing person's.
If any of these happen, stop the activity, return to the stated purpose, and check the consent conversation still covers what is now being done.
Small teams and large teams
The approach above is written for a team with a manager, a reviewer and a successor. Real organisations vary, and the same principles need different shapes.
For a small team
A team of three to eight people often has one manager who does most of the work. In that case, the risk sheet can be a single page, the review can cover only the last six months, and the interviews can be a single session of ninety minutes followed by a short follow-up. The main risk is that the manager becomes both the reviewer and the interviewer, and loses the distance that makes the record trustworthy. Our suggestion is to bring in a peer from another team to check the final register.
For a large organisation
In a larger organisation, the same work can be repeated across dozens of roles at once, which is where the process starts to strain. The priority list must be set centrally, otherwise every manager picks their own threshold and the effort is inconsistent. HR and L&D teams can provide a common template, a shared consent wording reviewed by legal, and a retention schedule that applies across projects.
The risk in a large organisation is that the process becomes a box to tick. Our suggestion is to measure whether successors used the records, not whether the records exist.
Where the approach does not fit
Some situations need a different approach. If the person is leaving under a disciplinary process, the project should not be run as a knowledge capture exercise at all, and HR should take advice on what records are appropriate. If the knowledge concerns a regulated activity, the process needs to sit alongside the organisation's compliance obligations and may require a different level of documentation. If the person has a health condition or is on leave for a reason that makes contact difficult, the timing and format should be agreed with them, and the project should not be used as a reason to pressure them into early contact.
Failure modes and how to spot them
Most failures in expertise capture are not dramatic. They are quiet, and they show up later, when a decision is revisited without the reasons or a stakeholder asks why the process has changed. The following list describes what to look for.
- The project starts late. The review and interviews are squeezed into the final week, and the record is thin. Spot it by checking the date of the first interview against the departure date.
- The record is never confirmed. Write-ups sit in a folder unchecked. Spot it by looking for write-ups without a confirmation date.
- The successor does not read it. The record exists but is not used. Spot it by asking the successor which parts they opened in the first month.
- The retention date is not set. Records remain in shared folders long after the handover. Spot it by checking the deletion dates in the project plan.
- Access is never reviewed. People who moved on still have read rights. Spot it by reviewing the access list on the day the handover closes.
- The purpose drifts. Notes about the work become notes about people. Spot it by reading a sample of entries against the purpose statement.
- Decisions are not dated. Old decisions appear as if they were made yesterday. Spot it by checking whether every decision has a date and a review trigger.
A short checklist for the next departure
When a planned departure, retirement or long leave is announced, a practical sequence is:
- Identify the knowledge at risk using the three questions above, and agree the list with the manager and the person.
- Confirm the purpose, the consent conversation and the retention period in writing.
- Review past meetings to build a list of decisions, stakeholders and open items to check.
- Run two or three knowledge interviews and send the write-ups back for confirmation.
- Schedule shadowing or supervised handover sessions with named dates.
- Publish a short, structured record with confirmation dates and review conditions.
- Limit access, review it when the handover ends, and delete detailed material on schedule.
- Ask the successor after a few weeks which parts of the record helped and which were missing, and update the template.
The last step is easy to skip, and it is the one that makes the process improve. Organisations that want to see how meeting intelligence can support onboarding and knowledge sharing can read the features overview. Teams ready to try the product can start at app.meetlytic.com.
Review and maintenance
An expertise capture process decays unless someone owns it. The templates go out of date, the consent wording no longer matches the tools, and the retention schedule drifts from what the organisation actually deletes. A short review, held on a fixed cycle, prevents most of this.
Our suggestion is to review the process once a year, and after any project that used it, whichever comes first. The review should cover four things: whether the templates still fit the work, whether the consent wording still describes what is done, whether the retention periods were followed, and whether successors found the records useful. Write down the changes and the date, and tell the people who run the next project.
Assign an owner. In a small team this may be the manager. In a larger organisation it is usually a named person in HR or L&D, with a deputy. Without an owner the process will still exist on paper, but nobody will know when it was last checked.
Capturing expertise is not about keeping every word a person has spoken. It is about making sure the decisions, relationships and judgement that keep work running are still available after they have gone, and that the record is handled with the same care as the people it describes. Start early, be clear about purpose, and keep the record small enough that someone can use it.
Frequently asked questions
Who should decide which knowledge is at risk?
The decision should be shared between the manager, a peer and, where possible, the person leaving. Use three questions to narrow the list: what they do that nobody else does, who they speak to that others do not, and what a successor would find surprising in the first month. Keep the purpose on protecting the work, not judging the person.
Can meeting records be used to find what someone knew?
Yes, as a starting point. Past meetings show where decisions were discussed and what reasons were given, which helps the reviewer prepare for a knowledge interview. Every summary should be checked against its source and treated as a list of questions to confirm, not a verdict.
Does the departing person have to take part?
They should be asked, and their choice should be respected. If they decline, the work can still be documented from the team's side and from existing records with suitable safeguards. Declining should never affect their notice, references or final pay.
How long should expertise records be kept?
Set the period before the project starts, based on the handover window plus a short review. Delete detailed interview notes and recordings on schedule, and keep only confirmed business content if it is still needed. Limit access to the people doing the handover and review it when the handover ends.
How many knowledge interviews are enough?
Two or three sessions spaced over several weeks is a common pattern, and it leaves time for the person to remember caveats and for the successor to return with questions. Our suggestion is to stop when the decision list is covered and the successor is no longer finding gaps. A longer programme is not better if the questions have stopped producing new knowledge.
Can meeting insight be used to judge how well someone performed?
No. Meeting insight should be used to find where decisions were made and which topics recur, at the level of the team and the work. Counting contributions, scoring tone or comparing colleagues has no place in this process and would make people less candid.
What should a small team do without a dedicated reviewer?
The manager can run the review, but a peer from another team should check the final register so that the manager is not both the reviewer and the judge of the record. Keep the risk sheet to a single page and the review to the last six months. A short weekly note during the handover period can make up for the lack of formal structure.
How do we know the record is working?
Ask the successor, after a few weeks, which parts of the record they used and which were missing. Check whether decisions were revisited with their reasons intact, and whether the retention and access steps were completed on schedule. If the answers are positive, keep the template. If not, change one or two things and check again.